Ebbw Vale Rail Line

Client

Amco Giffen / Network Rail

Project Type

Bespoke Railway Fencing Solutions

Location

Newbridge & Llanhilleth Stations – Ebbw Vale Rail Line

The Background

As part of the Ebbw Vale Rail Line upgrades, Procter Contracts was appointed by Amco Giffen to design, manufacture, and install over 750 linear metres of bespoke fencing across Newbridge and Llanhilleth stations.

The scope included:

  • Platform pedestrian guardrails

  • Trackside V-mesh fencing with kick plates

  • RAMwall-integrated fencing

  • Vehicle barriers and bollards

  • Custom fin fencing manufactured in-house

This project played a key role in supporting Network Rail’s mission to improve safety, accessibility, and infrastructure for commuters and local communities.

The Solution

The project presented significant challenges, including restricted site access, safety requirements on active railway lines, and sensitive environmental considerations.

  • Newbridge Station: The RAMwall access ramp required a unique approach. Built from recycled steel and aggregate with no concrete, it demanded a custom fencing solution that followed its contours without compromising integrity. Our in-house design team developed railings and fencing that delivered safety, sustainability, and structural performance.

  • Llanhilleth Station: Privacy concerns for local residents led us to engineer bespoke fin fencing. This design balanced airflow, visibility, and crowd safety while minimising visual impact. The tailored design was developed through iterative prototyping to meet strict functional and aesthetic requirements.

Our in-house manufacturing capability allowed us to adapt and deliver custom solutions quickly and to the exact specifications of each station.

The Result or Feedback

The completed installations enhanced the safety, accessibility, and visual appeal of both stations while addressing sustainability and community requirements.

Key project outcomes included:

  • Secure, durable fencing systems tailored to unique site conditions

  • Reduced carbon footprint through use of RAMwall and recyclable materials

  • Improved commuter safety with robust guardrails, barriers, and cladding

  • Positive community impact by respecting privacy concerns and minimising disruption

“Through innovative design and collaboration, Procter Contracts delivered fencing solutions that exceeded expectations, balancing safety, sustainability, and community needs.”